I-95 Interchange at Boynton Beach Boulevard Design Project
Design Public Meeting, February 22, 2023
- Public Meeting Flyer
- Comment Form
- Copy of Presentation
- Exhibit Banner 1
- Exhibit Banner 2
- Exhibit Typical Sections
- Video of Public Meeting
Project Development and Environment (PD&E) Study Documents
Public Hearing, August 29, 2017
Display Boards:
- Welcome
- Title VI
- National Environmental Policy Act (NEPA) Memorandum of Understanding (MOU)
- Project Location Map
- Project Development and Environment (PD&E) Study Process
- Project Schedule
- Boynton Beach Boulevard Aerial Map
- Gateway Boulevard Aerial Map
- Boynton Beach Boulevard Level of Service
- Gateway Boulevard Level of Service
- Boynton Beach Boulevard Right of Way Impacts
- Gateway Boulevard Single Point Urban Interchange (SPUI) Right of Way Impacts
- Comparative Evaluation Matrices
- Noise Analysis
Documents for Review:
- Type 2 Categorical Exclusion (CE)
- Preliminary Engineering Report (PER)
- PER Appendices A-G
- PER Appendices H-O
- Cultural Resource Assessment Survey (CRAS)
- CRAS Technical Memorandum/Addendum
- Air Quality Technical Memorandum
- Final Systems Interchange Modification Report (SIMR)
- Pond Siting Report (PSR)
- Contamination Screening Evaluation Report (CSER)
- Wetland Evaluation Report (WER)
- Wildlife and Habitat Endangered Species Biological Assessment (ESBA)
- Section 4(f) Determination of Applicability (DOA)
- Section 4(f) DOA Appendices
- Noise Study Report (NSR)
Alternatives Public Workshop, July 28, 2016
- Newsletter No. 2 - July 2016
- PowerPoint Presentation - July 28, 2016
- Display Board - Welcome
- Display Board - Presentation
- Alternatives 1, 2 & 3 - Boynton Beach Boulevard
- Alternatives 1, 2 & 3 - Gateway Boulevard
- Evaluation Matrices - Boynton Beach Boulevard and Gateway Boulevard
- Project Schedule
- Project and Study Process
- Level of Service Lane Configuration - Boynton Beach Boulevard
- Level of Service Lane Configuration - Gateway Boulevard
- Comment Form
- Survey Poll Sheet
- Alernatives Public Workshop Summary
Public Kick-off Meeting Materials, September 17, 2015
- Newsletter No. 1 - September 2015
- PowerPoint Presentation - September 17, 2015
- Display Board - Welcome
- Display Boards - Aerials for Gateway Boulevard and Boynton Beach Boulevard Interchanges
- Display Board - PD&E Project Process
- Display Board - Project Schedule
- Comment Form
- Kick-off Meeting Summaries (Posted December 3, 2015)