EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

I-95 Interchange at Gateway Boulevard Design Project

District Office
Gerry O’Reilly
District Four Secretary

3400 W Commercial Blvd
Fort Lauderdale, FL 33309

Tel: 954-777-4091
Fax: 954-777-4191

Additional Contacts
Staff Directory

Welcome

The Florida Department of Transportation (FDOT) is conducting a design-bid-build project at the SR-9/Interstate 95 Gateway Boulevard Interchange and along Gateway Boulevard in the City of Boynton Beach in Palm Beach County. The purpose of the project is to widen, mill and resurface the existing SR 9/I- 95 at Gateway Boulevard interchange (Exit 59) to enhance operational capacity, reduce congestion and increase safety. The project includes work at the I-95 interchange and on Gateway Boulevard from west of High Ridge Road to east of Seacrest Boulevard.

Project At-A-Glance

District
Four

Start Date
Design Phase began in 2017

Current Design Completion / Construction Letting
July 2026

Construction Completion
Summer 2029

Construction Cost
$89M

Length and Limits
The length of the project is about 1 mile on Gateway Boulevard from west of High Ridge Road to east of Seacrest Boulevard, and about 1 mile on SR-9/I-95 from south of the interchange to north of the interchange.

Consultant
HNTB Corporation

FDOT Project Manager
Thuc H. Le, PE
954-777-4552
thuc.le@dot.state.fl.us

 
Financial ID # 231932-1-32-01
I-95 at Gateway Boulevard