EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

I-95 Interchange at Boynton Beach Boulevard Design Project

Home / About the Project

About the Project


Boynton Beach Boulevard Interchange is a Design-bid-build (DBB) project that includes the preparation of design documents that can be advertised for a construction contract. The project is scheduled to begin in the fall of 2023 in Fiscal Year 2024.

This design-bid-build project consists of widening, milling and resurfacing the existing SR-9 / I-95 at Boynton Beach Boulevard interchange (Exit 57). Work on I-95 will occur for the Boynton Beach Boulevard bridge widening and for each of the ramps; and work on SR-804 / Boynton Beach Boulevard will occur from Old Boynton Road / SW 8th Street to Seacrest Boulevard. This interchange project proposes to enhance operational capacity, reduce congestion, and increase safety.