I-95 Interchange at Boynton Beach Boulevard Design Project

Home / About the Project

About the Project


Boynton Beach Boulevard Interchange is a Design-bid-build (DBB) project that includes the preparation of design documents that can be advertised for a construction contract. Currently, construction is anticipated to begin in 2023.

This design-bid-build project consists of widening, milling and resurfacing the existing SR-9 / I-95 at Boynton Beach Boulevard interchange (Exit 57). Work on I-95 will occur for the Boynton Beach Boulevard bridge widening and for each of the ramps; and work on SR-804 / Boynton Beach Boulevard will occur from Old Boynton Road / SW 8th Street to just east of NW 3rd Street. This interchange project proposes to enhance operational capacity, reduce congestion, and increase safety.